Blog
Successful Fabrication and Commissioning of Specialized Naval Structures at ECI
At ECI, we have successfully completed the manufacturing and commissioning of the 2+2 structures designed to support two sailboats during our client's maintenance work. These structures feature two different types of cradles and have [...]
Successful Crafting of Three Units of Solid Screw Conveyor Transport at Eci
This week at Eci, we have successfully commissioned three units of solid screw conveyor transport. Each of these conveyors consists of a trough channel with double screw, one rotating to the right and the [...]
Development of machines for biomass decompaction.
Last week, in the facilities adjacent to our facilities, we were able to successfully complete the loading and start-up test of the first of the three biomass decompaction machines, with a load of 50 [...]
Fair Global Industrie 2023
At Talleres ECI we are very proud of the professionality and good reception of everyone we came across at the Global Industrie event in Lyon. We were able to exchange information with many providers, [...]
Construction of gas degreaser to reduce emissions
Recently, in Talleres ECI we finished the construction of one of our most ambitious projects so far this year. It is a degreaser for the different phases of steel production, which avoids the release [...]
Filtration equipment of AISI inox steel for petrochemical company
At Talleres ECI we are proud of what's to come, we already began with an exciting project, where we built and delivered two filtering pipes made of AISI inox steel and with a capacity [...]
Outdoor tanks crafted to be installed on a coal generation plant
This weekend we did the pre-assembly, in our installations, of two outdoor tanks destined to be installed on a coal generation plant. We used cranes to test the mounting in a controlled environment, [...]
AISI Inox steel tanks
This week at Talleres ECI, we delivered the first shipment of a total of 10 1.000L tanks made from AISI inox steel. The desosits themselves have stirring capacity due to the fact that our [...]
Personalized platform and stairs
This week at Talleres Eci we delivered the second shipment of a total of three for an important Aeronautic plant in Germany. This shipment is composed by five platforms created with different workplace stations [...]
Port access structure
Last week in ECI Workshops we realized the last shipping of an extraordinary project, the fabrication and mounting of a structure with two stairs, for a European port. One of the stairs goes [...]
Hydroelectric Central Gates
At the beginning of this month, the wielders and engineers at the ECI workshop successfully realized non-destructive trials and errors on three gates in the presence of an inspector. All trials and permits [...]
Piping welding
Welding high pressure pipes made of carbon steel Ø 8” a 12” with 100% radiography for a hydrocarbon client in Cartagena.