This weekend we did the pre-assembly, in our installations, of two outdoor tanks destined to be installed on a coal generation plant. We used cranes to test the mounting in a controlled environment, so we can make a smooth installation in it’s final destination, Germany.
There will be a total of ten tanks delivered to the customer, all following the same procedure. We care about quality.
📞+34 93 864 83 65
✉️ eci@tallereseci.com
🌐 www.tallereseci.com